{"dataset":"hydrogen-map","title":"H2GHUB hydrogen map — hubs and corridors","updated":"2026-10-24","license":"Compilation by H2GHUB; each fact keeps the licence of its source (see sources).","sources":[{"id":"bnetza_core","name":"Bundesnetzagentur — Hydrogen core network","publisher":"Bundesnetzagentur","url":"https://www.bundesnetzagentur.de/EN/Areas/Energy/HydrogenCoreNetwork/start.html","license":"Information publique","attribution":"Bundesnetzagentur","date_retrieved":"2026-10-24"},{"id":"cenet_h2hubs_2026","name":"Cenet Capital — Hydrogen Hubs in 2026: Which Survived and What It Means for 45V","publisher":"Cenet Capital","url":"https://www.cenetcapital.com/blog/hydrogen-hubs-status-2026","license":"Article public — chiffres cités avec attribution","attribution":"Cenet Capital, 15 October 2026 (source secondaire)","date_retrieved":"2026-10-24"},{"id":"cew_de_nws","name":"Clean Energy Wire — Germany's National Hydrogen Strategy (factsheet)","publisher":"Clean Energy Wire","url":"https://www.cleanenergywire.org/factsheets/germanys-national-hydrogen-strategy","license":"Article public","attribution":"Clean Energy Wire, on the July 2023 update of Germany's National Hydrogen Strategy","date_retrieved":"2026-10-24"},{"id":"ec_south2","name":"European Commission — Global Gateway: Southern Hydrogen Corridor","publisher":"European Commission (DG INTPA)","url":"https://international-partnerships.ec.europa.eu/policies/global-gateway/southern-hydrogen-corridor-connecting-north-africa-italy-austria-and-germany_en","license":"© European Union — réutilisation autorisée avec mention de la source","attribution":"European Commission","date_retrieved":"2026-10-24"},{"id":"ehb_2022","name":"European Hydrogen Backbone — A European hydrogen infrastructure vision covering 28 countries (April 2022)","publisher":"European Hydrogen Backbone initiative (gas TSOs)","url":"https://new2024-owa-mnx.oge.net/_Resources/Persistent/1/0/2/5/10258774180f2df8e5297c47195c9b000fc5618e/2022-04-05_Report_EHB_final.pdf","license":"Rapport public — chiffres cités avec attribution","attribution":"European Hydrogen Backbone (2022)","date_retrieved":"2026-10-24"},{"id":"gem_egt_2025","name":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","publisher":"Global Energy Monitor","url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","license":"CC BY 4.0","attribution":"Global Energy Monitor, Europe Gas Tracker, January 2025 (hydrogen edition), CC BY 4.0","date_retrieved":"2026-10-24"},{"id":"gie_ehb_2024","name":"Gas Infrastructure Europe — European Hydrogen Backbone: boosting EU resilience and competitiveness (press release)","publisher":"Gas Infrastructure Europe / European Hydrogen Backbone initiative","url":"https://www.gie.eu/press/european-hydrogen-backbone-boosting-eu-resilience-and-competitiveness/","license":"Communiqué public — chiffres cités avec attribution","attribution":"Gas Infrastructure Europe, press release of 20 November 2024","date_retrieved":"2026-10-24"},{"id":"hc_compass_2026","name":"Hydrogen Council — Global Hydrogen Compass 2026","publisher":"Hydrogen Council","url":"https://compass.hydrogencouncil.com/","license":"© Hydrogen Council — chiffres cités avec attribution","attribution":"Hydrogen Council (2026), Global Hydrogen Compass 2026 (Hydrogen Project & Investment Tracker, June 2026)","date_retrieved":"2026-10-24"},{"id":"he_chm_2026","name":"Hydrogen Europe — Clean Hydrogen Monitor 2026","publisher":"Hydrogen Europe","url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","attribution":"Hydrogen Europe (2026), Clean Hydrogen Monitor 2026","date_retrieved":"2026-10-24"},{"id":"iea_ghr_2026","name":"IEA — Global Hydrogen Review 2026","publisher":"International Energy Agency","url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","license":"CC BY 4.0","attribution":"IEA (2026), Global Hydrogen Review 2026, CC BY 4.0","date_retrieved":"2026-10-24"},{"id":"iea_oman_2023","name":"IEA — Oman's huge renewable hydrogen potential (Renewable Hydrogen from Oman, 2023)","publisher":"International Energy Agency","url":"https://www.iea.org/news/omans-huge-renewable-hydrogen-potential-can-bring-multiple-benefits-in-its-journey-to-net-zero-emissions","license":"CC BY 4.0","attribution":"IEA (2023), Renewable Hydrogen from Oman","date_retrieved":"2026-10-24"},{"id":"iea_policy_uae","name":"IEA Policies database — UAE National Hydrogen Strategy (2023)","publisher":"International Energy Agency","url":"https://www.iea.org/policies/25916","license":"CC BY 4.0","attribution":"IEA Policies database, CC BY 4.0","date_retrieved":"2026-10-24"},{"id":"iea_tracker","name":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","publisher":"International Energy Agency","url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","license":"CC BY 4.0","attribution":"IEA (2026), Hydrogen Tracker / Hydrogen Production and Infrastructure Projects Database, CC BY 4.0. Aggregation by H2GHUB.","date_retrieved":"2026-10-24"},{"id":"natran_h2med_2026","name":"NaTran — H2Med project presentation (February 2026)","publisher":"NaTran (with REN, Enagás, Teréga, OGE)","url":"https://www.natrangroupe.com/sites/default/files/h2/h2med-presentation-february2026.pdf","license":"Document public — chiffres cités avec attribution","attribution":"H2Med project presentation, NaTran, February 2026","date_retrieved":"2026-10-24"},{"id":"perezllorca_pt_2024","name":"Pérez-Llorca — Revised Portuguese National Energy and Climate Plan 2021-2030 (legal briefing)","publisher":"Pérez-Llorca","url":"https://perezllorca.com/wp-content/uploads/2024/07/Legal-Briefing-Revised-Portuguese-National-Energy-and-Climate-Plan-2021-2030-esg.pdf","license":"Document public","attribution":"Pérez-Llorca (2024), on the revised PNEC 2030 submitted for consultation on 22 July 2024","date_retrieved":"2026-10-24"},{"id":"pmindia_nghm","name":"Government of India — Cabinet approves National Green Hydrogen Mission","publisher":"Prime Minister's Office, India","url":"https://www.pmindia.gov.in/en/news_updates/cabinet-approves-national-green-hydrogen-mission/","license":"Information publique","attribution":"Government of India (2023)","date_retrieved":"2026-10-24"},{"id":"spglobal_aus_2024","name":"S&P Global — Australia's renewed strategy eyes 15 MMt/y green hydrogen output by 2050","publisher":"S&P Global Commodity Insights","url":"https://www.spglobal.com/energy/en/news-research/latest-news/energy-transition/091324-australias-renewed-strategy-eyes-15-mmty-green-hydrogen-output-by-2050","license":"Article public — chiffres cités avec attribution","attribution":"S&P Global, 13 September 2024","date_retrieved":"2026-10-24"}],"layers":[{"id":"pipeline","kind":"flows","focus":[8,42],"zoom":1.55},{"id":"maritime","kind":"flows","focus":[10,18],"zoom":1.05},{"id":"northafrica","kind":"flows","focus":[6,34],"zoom":1.9},{"id":"committed","kind":"flows","focus":[12,30],"zoom":1.15},{"id":"foresight","kind":"flows","focus":[10,25],"zoom":1.0},{"id":"projects","kind":"data","focus":[20,22],"zoom":1.0,"datasets":["iea-projects-by-country","iea-projects-africa-middle-east"]},{"id":"europe","kind":"data","focus":[12,50],"zoom":2.6,"datasets":["chm-2026-europe","gem-2025-europe-hydrogen","gem-2025-derivative-terminals","iea-hydrogen-pipelines"]},{"id":"investment","kind":"data","focus":[45,30],"zoom":1.0,"datasets":["hydrogen-council-compass-2026"]}],"hubs":[{"id":"TN","iso":"TN","coords":[10.18,36.8],"kind":"production","status":"target","r":6,"layers":["northafrica","foresight"],"facts":[{"value":320,"unit":"kt H2/yr (2030 target)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 219 (Chapter 8)","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":8.3,"unit":"Mt H2/yr (2050 target, of which 6 Mt exported by pipeline)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 219-220","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":3.9,"unit":"GW electrolysis (2030 target)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 219","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":3,"unit":"projects mapped (971 kt H2/yr announced, none at FID)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Tunisia","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":339,"unit":"kt H2/yr — H2Notos phase 1, feasibility study, start 2032","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 2815","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"MA","iso":"MA","coords":[-7.6,33.57],"kind":"production","status":"target","r":6,"layers":["northafrica","foresight"],"facts":[{"value":300000,"unit":"ha (first tranche of the Morocco Offer)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 218, note 89","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":6,"unit":"projects with preliminary land-reservation agreements (Feb. 2026)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 218","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":"415–905","unit":"kt H2 (2030 production envisaged by the strategy)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 218","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":3.6,"unit":"Mt ammonia imported (2024)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 22 (Chapter 1)","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":14,"unit":"projects mapped (2,083 kt H2/yr announced, none at FID)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Morocco","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"DZ","iso":"DZ","coords":[-0.3,35.85],"kind":"production","status":"target","r":6,"layers":["northafrica","foresight"],"facts":[{"value":"0.9–1.2","unit":"Mt renewable H2 for export (2040)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 218","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":300,"unit":"kt fossil-based H2 for the domestic market (2040)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 218","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":20,"unit":"% of Africa’s hydrogen demand (3.1 Mt in 2024)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 216","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"EG","iso":"EG","coords":[31.24,30.04],"kind":"production","status":"planned","r":6,"layers":["northafrica","foresight"],"facts":[{"value":15,"unit":"MW electrolysis in operation","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 220","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":2.2,"unit":"kt H2/yr — EBIC ammonia plant phase 1, operational since 2022","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 1368","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":"1.5–3.2","unit":"Mt H2 demand in 2030 (strategy scenarios, 1.4–2.8 Mt exported)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 220","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":"19.5 → 397","unit":"kt ammonia (2027 → 2033), H2Global contract with Fertiglobe","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 50 (Figure 3.6, extra-EU trade agreements)","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":16,"unit":"projects mapped (2,197 kt H2/yr announced, 1 operational)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Egypt","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"MR","iso":"MR","coords":[-17.03,20.94],"kind":"production","status":"study","r":7,"layers":["maritime","foresight"],"facts":[{"value":1.2,"unit":"Mt H2 in 2030 (exported as 6.9 Mt ammonia)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 219","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":7,"unit":"land concessions signed (at least; 23 Mt ammonia)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 219","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":20,"unit":"Mt ammonia — the two largest projects, put on hold","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 219","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":280,"unit":"kt H2/yr — Project Nour phase 1, feasibility study, start 2031","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 1335","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"NA","iso":"NA","coords":[15.16,-26.65],"kind":"production","status":"study","r":7,"layers":["maritime","foresight"],"facts":[{"value":"1–2","unit":"Mt renewable H2 in 2030","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 218","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":173,"unit":"kt H2/yr — Hyphen phase I, feasibility study, start 2027","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 1346","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":2.0,"unit":"kt H2/yr — Oshivela DRI project phase 1, operational 2025","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 2592","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":200,"unit":"kt/yr DRI (up to) — HyIron to Benteler offtake, first volumes 2026","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 50 (Figure 3.6)","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"ZA","iso":"ZA","coords":[16.45,-28.65],"kind":"production","status":"study","r":6,"layers":["maritime","foresight"],"facts":[{"value":13,"unit":"GW electrolysis (2030, strategy)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 219","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":60,"unit":"MW electrolysis in operation","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 220","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":147,"unit":"kt H2/yr — Coega green ammonia plant, feasibility study, start 2029","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 1446","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"SA","iso":"SA","coords":[34.85,28.31],"kind":"production","status":"construction","r":7,"layers":["maritime","committed"],"facts":[{"value":2.2,"unit":"GW electrolysis under construction (NEOM)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 20, Box 1.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":373,"unit":"kt H2/yr — NEOM Green Hydrogen Project, FID/construction, start 2027","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 585","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":4,"unit":"GW — Yanbu Green Hydrogen Hub, front-end engineering design","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 20, Box 1.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"OM","iso":"OM","coords":[57.7,19.67],"kind":"production","status":"target","r":6,"layers":["maritime","foresight"],"facts":[{"value":1,"unit":"Mt H2/yr (at least, 2030)","source":"IEA — Oman's huge renewable hydrogen potential (Renewable Hydrogen from Oman, 2023)","source_id":"iea_oman_2023","source_url":"https://www.iea.org/news/omans-huge-renewable-hydrogen-potential-can-bring-multiple-benefits-in-its-journey-to-net-zero-emissions","page_or_table":"News release (Renewable Hydrogen from Oman)","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":3.75,"unit":"Mt H2/yr (up to, 2040)","source":"IEA — Oman's huge renewable hydrogen potential (Renewable Hydrogen from Oman, 2023)","source_id":"iea_oman_2023","source_url":"https://www.iea.org/news/omans-huge-renewable-hydrogen-potential-can-bring-multiple-benefits-in-its-journey-to-net-zero-emissions","page_or_table":"News release","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":8.5,"unit":"Mt H2/yr (up to, 2050)","source":"IEA — Oman's huge renewable hydrogen potential (Renewable Hydrogen from Oman, 2023)","source_id":"iea_oman_2023","source_url":"https://www.iea.org/news/omans-huge-renewable-hydrogen-potential-can-bring-multiple-benefits-in-its-journey-to-net-zero-emissions","page_or_table":"News release","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":13,"unit":"projects mapped (4,320 kt H2/yr announced, 1 at FID: 54 kt)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Oman","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"AE","iso":"AE","coords":[54.5,24.3],"kind":"production","status":"target","r":6,"layers":["maritime","foresight"],"facts":[{"value":1.4,"unit":"Mt H2/yr by 2031 (1 renewable + 0.4 low-carbon)","source":"IEA Policies database — UAE National Hydrogen Strategy (2023)","source_id":"iea_policy_uae","source_url":"https://www.iea.org/policies/25916","page_or_table":"Policy 25916","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":15,"unit":"Mt H2/yr by 2050","source":"IEA Policies database — UAE National Hydrogen Strategy (2023)","source_id":"iea_policy_uae","source_url":"https://www.iea.org/policies/25916","page_or_table":"Policy 25916","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":20,"unit":"× growth needed 2025–2031 to meet the target","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 32","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"estimate"}]},{"id":"AU","iso":"AU","coords":[145.0,-38.3],"kind":"production","status":"pilot","r":7,"layers":["maritime","committed"],"facts":[{"value":1250,"unit":"m³ liquefied-hydrogen tank (85 t H2), first LH2 shipments in 2022","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 189 (Chapter 6, innovation)","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":15,"unit":"Mt H2/yr by 2050 (stretch goal 30 Mt)","source":"S&P Global — Australia's renewed strategy eyes 15 MMt/y green hydrogen output by 2050","source_id":"spglobal_aus_2024","source_url":"https://www.spglobal.com/energy/en/news-research/latest-news/energy-transition/091324-australias-renewed-strategy-eyes-15-mmty-green-hydrogen-output-by-2050","page_or_table":"Article of 13 Sept. 2024","date_retrieved":"2026-10-24","license":"Article public — chiffres cités avec attribution","kind":"target"},{"value":74,"unit":"projects mapped (12,563 kt H2/yr announced, 18 operational or at FID)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Australia","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"CL","iso":"CL","coords":[-70.87,-53.15],"kind":"production","status":"study","r":6,"layers":["maritime","foresight"],"facts":[{"value":"8–15","unit":"GW electrolysis by 2035 (previously 25 GW by 2030)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 32","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":32,"unit":"projects mapped (4,001 kt H2/yr announced)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Chile","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"BR","iso":"BR","coords":[-38.84,-3.55],"kind":"production","status":"study","r":5,"layers":["maritime","foresight"],"facts":[{"value":34,"unit":"projects mapped (4,244 kt H2/yr announced)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Brazil","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":300,"unit":"billion BRL (≈ USD 58 bn), New Industry Brazil programme 2024–26","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 209","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"CA","iso":"CA","coords":[-61.35,45.62],"kind":"production","status":"planned","r":6,"layers":["maritime","foresight"],"facts":[{"value":1638,"unit":"kt H2/yr operational (493) or at FID/construction (1,145)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Canada","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":33,"unit":"projects mapped","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Canada","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"US","iso":"US","coords":[-94.8,29.3],"kind":"production","status":"planned","r":6,"layers":["maritime","foresight"],"facts":[{"value":7,"unit":"billion USD — up to, for seven H2Hubs (2023)","source":"Cenet Capital — Hydrogen Hubs in 2026: Which Survived and What It Means for 45V","source_id":"cenet_h2hubs_2026","source_url":"https://www.cenetcapital.com/blog/hydrogen-hubs-status-2026","page_or_table":"Article of 15 Oct. 2026","date_retrieved":"2026-10-24","license":"Article public — chiffres cités avec attribution","kind":"historical"},{"value":2.2,"unit":"billion USD — ARCHES and PNWH2 awards terminated (Oct. 2025)","source":"Cenet Capital — Hydrogen Hubs in 2026: Which Survived and What It Means for 45V","source_id":"cenet_h2hubs_2026","source_url":"https://www.cenetcapital.com/blog/hydrogen-hubs-status-2026","page_or_table":"Article of 15 Oct. 2026","date_retrieved":"2026-10-24","license":"Article public — chiffres cités avec attribution","kind":"historical"},{"value":26,"unit":"billion USD committed investment by 2030 (North America)","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — North America","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"historical"},{"value":2.9,"unit":"Mtpa committed low-carbon capacity (>75% of global)","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — North America","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"historical"}]},{"id":"IN","iso":"IN","coords":[70.2,23.0],"kind":"production","status":"target","r":7,"layers":["maritime","foresight"],"facts":[{"value":5,"unit":"Mt H2/yr by 2030 (at least)","source":"Government of India — Cabinet approves National Green Hydrogen Mission","source_id":"pmindia_nghm","source_url":"https://www.pmindia.gov.in/en/news_updates/cabinet-approves-national-green-hydrogen-mission/","page_or_table":"Cabinet decision of 4 Jan. 2023","date_retrieved":"2026-10-24","license":"Information publique","kind":"target"},{"value":125,"unit":"GW of associated renewable capacity","source":"Government of India — Cabinet approves National Green Hydrogen Mission","source_id":"pmindia_nghm","source_url":"https://www.pmindia.gov.in/en/news_updates/cabinet-approves-national-green-hydrogen-mission/","page_or_table":"Cabinet decision of 4 Jan. 2023","date_retrieved":"2026-10-24","license":"Information publique","kind":"target"},{"value":724,"unit":"ktpa renewable ammonia awarded (SIGHT, first tranche)","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — India","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"historical"},{"value":500,"unit":"ktpa ammonia (90 ktpa H2), AM Green Kakinada → Uniper, binding, 2028","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 144, Table 5.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"ES","iso":"ES","coords":[-5.44,36.13],"kind":"production","status":"target","r":5,"layers":["northafrica","foresight"],"facts":[{"value":12,"unit":"GW electrolysis by 2030 (NECP, Sept. 2024)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 199 (figure note)","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":0.4,"unit":"GWel reaching FID in H1 2026","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 26","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":0.6,"unit":"Mt H2 demand (2025)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 21, Figure 1.2","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"PT","iso":"PT","coords":[-8.87,37.95],"kind":"production","status":"target","r":5,"layers":["northafrica","foresight"],"facts":[{"value":3,"unit":"GW electrolysis by 2030 (revised PNEC 2030, down from 5.5 GW)","source":"Pérez-Llorca — Revised Portuguese National Energy and Climate Plan 2021-2030 (legal briefing)","source_id":"perezllorca_pt_2024","source_url":"https://perezllorca.com/wp-content/uploads/2024/07/Legal-Briefing-Revised-Portuguese-National-Energy-and-Climate-Plan-2021-2030-esg.pdf","page_or_table":"Legal briefing, July 2024","date_retrieved":"2026-10-24","license":"Document public","kind":"target"}]},{"id":"DE","iso":"DE","coords":[9.99,53.54],"kind":"import","status":"target","r":7,"layers":["pipeline","foresight"],"facts":[{"value":"95–130","unit":"TWh H2 demand in 2030 (50–70% imported)","source":"Clean Energy Wire — Germany's National Hydrogen Strategy (factsheet)","source_id":"cew_de_nws","source_url":"https://www.cleanenergywire.org/factsheets/germanys-national-hydrogen-strategy","page_or_table":"Factsheet (NWS update, July 2023)","date_retrieved":"2026-10-24","license":"Article public","kind":"target"},{"value":10,"unit":"GW electrolysis by 2030","source":"Clean Energy Wire — Germany's National Hydrogen Strategy (factsheet)","source_id":"cew_de_nws","source_url":"https://www.cleanenergywire.org/factsheets/germanys-national-hydrogen-strategy","page_or_table":"Factsheet","date_retrieved":"2026-10-24","license":"Article public","kind":"target"},{"value":9040,"unit":"km hydrogen core network, approved 22 Oct. 2024, operation by 2032","source":"Bundesnetzagentur — Hydrogen core network","source_id":"bnetza_core","source_url":"https://www.bundesnetzagentur.de/EN/Areas/Energy/HydrogenCoreNetwork/start.html","page_or_table":"Hydrogen core network page","date_retrieved":"2026-10-24","license":"Information publique","kind":"historical"},{"value":1.3,"unit":"GWel under construction (0.2 GWel operating)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 26","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":1.5,"unit":"Mt H2 demand (2025)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 21, Figure 1.2","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":506,"unit":"km hydrogen pipelines operational (2025)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Infrastructure — Germany, 2025","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"NL","iso":"NL","coords":[4.48,51.95],"kind":"import","status":"target","r":7,"layers":["pipeline","foresight"],"facts":[{"value":1.2,"unit":"GW electrolysis in 2030 (3–4 GW postponed to 2035)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 32 and p. 199 (figure note)","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":200,"unit":"MWel — Holland Hydrogen 1, commercial operation 2026","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 28, Figure 1.9","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":32,"unit":"km — first section of the national hydrogen network, inaugurated May 2026","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 48","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":1.1,"unit":"Mt H2 demand (2025)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 21, Figure 1.2","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"BE","iso":"BE","coords":[4.4,51.26],"kind":"import","status":"planned","r":5,"layers":["pipeline","foresight"],"facts":[{"value":30,"unit":"t ammonia/day — Air Liquide cracking pilot, Port of Antwerp-Bruges (2025)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 49","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":1.2,"unit":"GWel investment need by 2030 vs ≈0.1 GWel domestic pipeline","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 46, Figure 3.4","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":"draft","unit":"RED III transposition status (transport)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 35 and p. 40","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"FR","iso":"FR","coords":[4.88,43.4],"kind":"import","status":"planned","r":6,"layers":["pipeline","foresight"],"facts":[{"value":400,"unit":"km — BarMar (Barcelona–Marseille), about","source":"NaTran — H2Med project presentation (February 2026)","source_id":"natran_h2med_2026","source_url":"https://www.natrangroupe.com/sites/default/files/h2/h2med-presentation-february2026.pdf","page_or_table":"H2Med presentation","date_retrieved":"2026-10-24","license":"Document public — chiffres cités avec attribution","kind":"historical"},{"value":2,"unit":"Mt H2/yr — BarMar maximum capacity, commercial operation 2032","source":"NaTran — H2Med project presentation (February 2026)","source_id":"natran_h2med_2026","source_url":"https://www.natrangroupe.com/sites/default/files/h2/h2med-presentation-february2026.pdf","page_or_table":"H2Med presentation","date_retrieved":"2026-10-24","license":"Document public — chiffres cités avec attribution","kind":"historical"},{"value":200,"unit":"MWel — Normand’Hy, commercial operation 2026","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 28, Figure 1.9","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":0.5,"unit":"Mt H2 demand (2025)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 21, Figure 1.2","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"IT","iso":"IT","coords":[15.08,37.5],"kind":"import","status":"planned","r":6,"layers":["northafrica","foresight"],"facts":[{"value":3300,"unit":"km — SoutH2 Corridor (North Africa–Italy–Austria–Germany), 2030s","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 250","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":2711,"unit":"km of hydrogen pipelines announced in Italy by 2035 (feasibility)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Infrastructure — Italy, 2035","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":0.6,"unit":"Mt H2 demand (2025)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 21, Figure 1.2","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"PL","iso":"PL","coords":[18.65,54.35],"kind":"import","status":"study","r":5,"layers":["pipeline","foresight"],"facts":[{"value":0.7,"unit":"Mt H2 demand (2025)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 21, Figure 1.2","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":2.4,"unit":"GWel investment need by 2030 vs ≈0.1 GWel domestic pipeline","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 46, Figure 3.4","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":1.4,"unit":"€/kg — proposed RED III non-compliance penalty (draft law)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 37, Figure 2.5","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"UK","iso":"GB","coords":[-1.16,54.6],"kind":"import","status":"planned","r":5,"layers":["pipeline","foresight"],"facts":[{"value":"HyMarnham","unit":"first HAR1 project in commercial operation (H1 2026)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 24","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":121,"unit":"projects mapped (6,843 kt H2/yr announced, of which 4,576 kt with CCUS)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — United Kingdom","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"JP","iso":"JP","coords":[139.75,35.53],"kind":"import","status":"target","r":6,"layers":["maritime","foresight"],"facts":[{"value":2,"unit":"Mt H2 demand today","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 209","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":3,"unit":"Mt H2 target in 2030","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 209","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":130,"unit":"kt low-emissions H2 — six CfD winners (May 2026)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 193 and p. 209","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":772,"unit":"kt ammonia from Blue Point (United States) supported by the CfD scheme","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 209","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"KR","iso":"KR","coords":[129.37,35.52],"kind":"import","status":"target","r":6,"layers":["maritime","foresight"],"facts":[{"value":500,"unit":"GWh — Clean Hydrogen Portfolio Standard 2026 (3,000 GWh target for 2025 suspended)","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — Japan & Korea","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"target"},{"value":7,"unit":"billion USD committed investment by 2030 (Japan & Korea)","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — Japan & Korea","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"historical"}]},{"id":"CN","iso":"CN","coords":[118.89,42.26],"kind":"production","status":"operating","r":7,"layers":["maritime","committed"],"facts":[{"value":0.75,"unit":"share of new electrolyser installations in 2025 (nearly three-quarters)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 12","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":500,"unit":"MW — Chifeng, world’s largest electrolysis project","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 83","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":300,"unit":"kt renewable H2 target for 2030, could be met in 2027","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 32","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":45,"unit":"billion USD committed investment by 2030","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — China","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"historical"}]},{"id":"SG","iso":"SG","coords":[103.82,1.26],"kind":"import","status":"planned","r":6,"layers":["maritime","foresight"],"facts":[{"value":570,"unit":"km of hydrogen pipelines announced by 2035 (520 km at FEED)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Infrastructure — Singapore, 2035","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":300,"unit":"ktpa ammonia (55 ktpa H2), L&T Kandla → ITOCHU, bunkering in Singapore","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 144, Table 5.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]}],"corridors":[{"id":"C01","type":"pipeline","status":"planned","width":3,"flow":3,"layers":["pipeline","foresight","northafrica"],"coords":[[-0.3,35.85],[3.27,36.9],[10.1,36.8],[10.18,36.81],[15.08,37.5],[16.37,48.21],[9.99,53.54]],"color":"#4FB3C7","dash":false,"facts":[{"value":3300,"unit":"km","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 250","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":"planning","unit":"project stage, commissioning in the 2030s","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 47, Figure 3.5","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":"2025-01-21","unit":"joint declaration of political intent (DZ, TN, IT, AT, DE)","source":"European Commission — Global Gateway: Southern Hydrogen Corridor","source_id":"ec_south2","source_url":"https://international-partnerships.ec.europa.eu/policies/global-gateway/southern-hydrogen-corridor-connecting-north-africa-italy-austria-and-germany_en","page_or_table":"Global Gateway page","date_retrieved":"2026-10-24","license":"© European Union — réutilisation autorisée avec mention de la source","kind":"historical"},{"value":"T-MED","unit":"one of the 8 energy highways of the EC T-MED initiative (€25 bn)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 47","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"C05","type":"subsea","status":"study","width":2,"flow":2,"layers":["pipeline","foresight","northafrica"],"coords":[[10.1,33.88],[10.18,36.81],[11.1,37.1],[12.6,37.65],[15.08,37.5]],"color":"#4FB3C7","dash":true,"facts":[{"value":"study","unit":"SeaCorridor study: offshore pipeline across the Strait of Sicily + onshore links (Oued Saf-Saf, southern Tunisia)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 250","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":455,"unit":"km of hydrogen pipelines announced in Tunisia to 2035 (feasibility, 78 km repurposed)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Infrastructure — Tunisia, 2035","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":339,"unit":"kt H2/yr — H2Notos phase 1, feasibility study, start 2032","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 2815","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C02","type":"subsea","status":"planned","width":3,"flow":2,"layers":["pipeline","foresight"],"coords":[[2.17,41.35],[4.88,43.4]],"color":"#4FB3C7","dash":false,"facts":[{"value":400,"unit":"km (about)","source":"NaTran — H2Med project presentation (February 2026)","source_id":"natran_h2med_2026","source_url":"https://www.natrangroupe.com/sites/default/files/h2/h2med-presentation-february2026.pdf","page_or_table":"H2Med presentation","date_retrieved":"2026-10-24","license":"Document public — chiffres cités avec attribution","kind":"historical"},{"value":2,"unit":"Mt H2/yr maximum capacity","source":"NaTran — H2Med project presentation (February 2026)","source_id":"natran_h2med_2026","source_url":"https://www.natrangroupe.com/sites/default/files/h2/h2med-presentation-february2026.pdf","page_or_table":"H2Med presentation","date_retrieved":"2026-10-24","license":"Document public — chiffres cités avec attribution","kind":"historical"},{"value":2032,"unit":"commercial operation date (target)","source":"NaTran — H2Med project presentation (February 2026)","source_id":"natran_h2med_2026","source_url":"https://www.natrangroupe.com/sites/default/files/h2/h2med-presentation-february2026.pdf","page_or_table":"H2Med presentation, timeline","date_retrieved":"2026-10-24","license":"Document public — chiffres cités avec attribution","kind":"target"},{"value":"2024-04-08","unit":"included in the EU list of Projects of Common Interest","source":"NaTran — H2Med project presentation (February 2026)","source_id":"natran_h2med_2026","source_url":"https://www.natrangroupe.com/sites/default/files/h2/h2med-presentation-february2026.pdf","page_or_table":"H2Med presentation","date_retrieved":"2026-10-24","license":"Document public — chiffres cités avec attribution","kind":"historical"}]},{"id":"C03","type":"pipeline","status":"planned","width":2,"flow":2,"layers":["pipeline","foresight"],"coords":[[-8.87,37.95],[-8.0,41.15],[-5.75,41.5],[-3.7,41.6],[2.17,41.35]],"color":"#4FB3C7","dash":false,"facts":[{"value":270,"unit":"km (about)","source":"NaTran — H2Med project presentation (February 2026)","source_id":"natran_h2med_2026","source_url":"https://www.natrangroupe.com/sites/default/files/h2/h2med-presentation-february2026.pdf","page_or_table":"H2Med presentation","date_retrieved":"2026-10-24","license":"Document public — chiffres cités avec attribution","kind":"historical"},{"value":0.75,"unit":"Mt H2/yr maximum capacity","source":"NaTran — H2Med project presentation (February 2026)","source_id":"natran_h2med_2026","source_url":"https://www.natrangroupe.com/sites/default/files/h2/h2med-presentation-february2026.pdf","page_or_table":"H2Med presentation","date_retrieved":"2026-10-24","license":"Document public — chiffres cités avec attribution","kind":"historical"}]},{"id":"C04","type":"network","status":"study","width":2,"flow":2,"layers":["pipeline","foresight"],"coords":[[4.88,43.4],[4.85,45.75],[6.2,48.7],[8.68,49.4],[9.99,53.54]],"color":"#4FB3C7","dash":true,"facts":[{"value":9040,"unit":"km German hydrogen core network, about 60% repurposed, operation by 2032","source":"Bundesnetzagentur — Hydrogen core network","source_id":"bnetza_core","source_url":"https://www.bundesnetzagentur.de/EN/Areas/Energy/HydrogenCoreNetwork/start.html","page_or_table":"Hydrogen core network page","date_retrieved":"2026-10-24","license":"Information publique","kind":"historical"},{"value":94,"unit":"km — MosaHYc (FR–LU–DE), construction started summer 2026, COD 2029","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 47, Figure 3.5","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"C18","type":"vision","status":"target","width":2,"flow":2,"layers":["pipeline","foresight"],"coords":[[2.17,41.35],[4.88,43.4],[4.48,51.95],[9.99,53.54],[16.37,48.21]],"color":"#D26A6A","dash":true,"facts":[{"value":58000,"unit":"km by 2040, about 60% repurposed (2024 update)","source":"Gas Infrastructure Europe — European Hydrogen Backbone: boosting EU resilience and competitiveness (press release)","source_id":"gie_ehb_2024","source_url":"https://www.gie.eu/press/european-hydrogen-backbone-boosting-eu-resilience-and-competitiveness/","page_or_table":"Press release of 20 Nov. 2024","date_retrieved":"2026-10-24","license":"Communiqué public — chiffres cités avec attribution","kind":"target"},{"value":53000,"unit":"km by 2040 (almost), 28 countries, ~60% repurposed (2022 edition)","source":"European Hydrogen Backbone — A European hydrogen infrastructure vision covering 28 countries (April 2022)","source_id":"ehb_2022","source_url":"https://new2024-owa-mnx.oge.net/_Resources/Persistent/1/0/2/5/10258774180f2df8e5297c47195c9b000fc5618e/2022-04-05_Report_EHB_final.pdf","page_or_table":"Report of 5 April 2022","date_retrieved":"2026-10-24","license":"Rapport public — chiffres cités avec attribution","kind":"target"},{"value":35346,"unit":"km announced in Europe to 2035 (1,151 km operational or FID/construction)","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Infrastructure — Europe, 2035","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":"≈1/3","unit":"of the network planned for 2030 on track","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 48","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":50165,"unit":"km of hydrogen pipeline projects in development in Europe (323 projects)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"Briefing p. 1 and p. 4","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C07","type":"shipping","status":"planned","width":3,"flow":2,"layers":["maritime","northafrica"],"coords":[[32.37,29.65],[32.55,29.97],[32.3,31.26],[18.0,34.5],[10.5,37.6],[-5.6,35.95],[-9.6,39.5],[-5.2,48.4],[4.48,51.95]],"color":"#4FB3C7","dash":false,"facts":[{"value":"19.5 → 397","unit":"kt ammonia (2027 → 2033), H2Global offtake by Hintco from Fertiglobe","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 50 (Figure 3.6)","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":7,"unit":"years — duration of the H2Global purchase agreement, fixed euro-denominated price","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 256 (Box 8.1)","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":15,"unit":"MW electrolysis in operation in Egypt","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 220","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C08","type":"shipping","status":"planned","width":3,"flow":2,"layers":["maritime","foresight"],"coords":[[34.96,27.76],[33.5,28.0],[32.55,29.97],[32.3,31.26],[18.0,34.5],[10.5,37.6],[-5.6,35.95],[-9.6,39.5],[-5.2,48.4],[9.99,53.54]],"color":"#4FB3C7","dash":false,"facts":[{"value":2.2,"unit":"GW electrolysis under construction (NEOM)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 20, Box 1.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":"MoU","unit":"Yanbu green H2 hub → EnBW (Germany), ammonia cracking for pipeline injection","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 144, Table 5.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":70,"unit":"% of Middle East ammonia and methanol exports passing through the Strait of Hormuz","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 19","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C09","type":"shipping","status":"planned","width":3,"flow":2,"layers":["maritime","foresight"],"coords":[[57.7,19.67],[72.0,10.0],[80.0,5.5],[95.0,6.0],[103.82,1.26],[114.0,12.0],[124.0,26.0],[139.75,35.53]],"color":"#4FB3C7","dash":false,"facts":[{"value":11,"unit":"billion USD committed investment by 2030 (Middle East), 15 projects, ≈500 ktpa","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — Middle East","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"historical"},{"value":0.2,"unit":"billion USD of new commitments in the last 12 months","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — Middle East","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"historical"}]},{"id":"C06","type":"shipping","status":"study","width":2,"flow":2,"layers":["maritime","foresight","northafrica"],"coords":[[-8.97,33.11],[-7.5,35.0],[-5.44,36.13],[-8.87,37.95]],"color":"#4FB3C7","dash":true,"facts":[{"value":300000,"unit":"ha — first tranche of the Morocco Offer","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 218, note 89","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":3.6,"unit":"Mt ammonia imported by Morocco (2024)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 22","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C10","type":"lh2","status":"pilot","width":3,"flow":2,"layers":["maritime","committed"],"coords":[[145.0,-38.3],[150.0,-35.0],[155.0,-20.0],[150.0,0.0],[142.0,20.0],[135.18,34.68]],"color":"#63D178","dash":false,"facts":[{"value":1250,"unit":"m³ (85 t H2), first LH2 shipments in 2022","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 189","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":40000,"unit":"m³ liquefied-hydrogen tanker ordered in early 2026, ocean trials by 2030","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 189","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C11","type":"shipping","status":"study","width":2,"flow":2,"layers":["maritime","foresight"],"coords":[[118.58,-20.31],[118.0,-8.0],[125.0,5.0],[127.0,22.0],[129.37,35.52]],"color":"#4FB3C7","dash":true,"facts":[{"value":500,"unit":"GWh — Korea’s Clean Hydrogen Portfolio Standard 2026","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — Japan & Korea","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"target"}]},{"id":"C14","type":"shipping","status":"study","width":3,"flow":2,"layers":["maritime","foresight"],"coords":[[15.16,-26.65],[8.0,-10.0],[-5.0,5.0],[-18.0,15.0],[-17.5,30.0],[-10.5,42.0],[-5.2,48.4],[4.48,51.95]],"color":"#4FB3C7","dash":true,"facts":[{"value":173,"unit":"kt H2/yr — Hyphen phase I, feasibility study","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 1346","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":347,"unit":"kt H2/yr — Hyphen phase II, feasibility study","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 1347","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":"grid + water","unit":"plans to feed surplus electricity to the grid and water to a nearby town","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 226","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C15","type":"shipping","status":"study","width":2,"flow":2,"layers":["maritime","foresight"],"coords":[[25.65,-33.92],[18.0,-36.0],[8.0,-15.0],[-8.0,5.0],[-18.0,18.0],[-12.0,40.0],[-5.2,48.4],[4.48,51.95]],"color":"#4FB3C7","dash":true,"facts":[{"value":13,"unit":"GW electrolysis by 2030 (strategy)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 219","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"},{"value":89,"unit":"% of global platinum-group metals reserves","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 221","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":147,"unit":"kt H2/yr — Coega green ammonia plant, feasibility study","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 1446","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C12","type":"shipping","status":"study","width":2,"flow":2,"layers":["maritime","foresight"],"coords":[[-70.87,-53.15],[-66.0,-55.5],[-55.0,-45.0],[-40.0,-30.0],[-28.0,-5.0],[-22.0,20.0],[-12.0,40.0],[-5.2,48.4],[4.48,51.95]],"color":"#4FB3C7","dash":true,"facts":[{"value":"8–15","unit":"GW by 2035 (previously 25 GW by 2030)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 32","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"target"}]},{"id":"C16","type":"shipping","status":"planned","width":2,"flow":2,"layers":["maritime","foresight"],"coords":[[-61.35,45.62],[-50.0,47.0],[-35.0,50.0],[-15.0,52.0],[-3.0,56.5],[8.15,53.53]],"color":"#4FB3C7","dash":false,"facts":[{"value":2.3,"unit":"Mtpa ammonia — Brunsbüttel FSRU import project (start 2026, first stage 0.3 Mtpa)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"Briefing, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":2.6,"unit":"Mtpa ammonia — Wilhelmshaven FSRU import project (start 2030)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"Briefing, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":0,"unit":"of 12 LNG-linked hydrogen-derivative import projects at FID or under construction","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"Briefing, Table 2","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C17","type":"shipping","status":"study","width":2,"flow":2,"layers":["maritime","foresight"],"coords":[[-94.8,29.3],[-86.0,25.0],[-80.5,25.0],[-70.0,33.0],[-45.0,42.0],[-20.0,47.5],[-5.2,48.4],[4.48,51.95]],"color":"#4FB3C7","dash":true,"facts":[{"value":450,"unit":"USD/t low-carbon ammonia (as low as, post-45Q, US Gulf Coast)","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — North America","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"estimate"}]},{"id":"C13","type":"shipping","status":"study","width":2,"flow":2,"layers":["maritime","foresight"],"coords":[[-70.87,-53.15],[-80.0,-40.0],[-100.0,-25.0],[-130.0,-15.0],[-160.0,-5.0],[175.0,5.0],[150.0,15.0],[139.75,35.53]],"color":"#4FB3C7","dash":true,"facts":[{"value":32,"unit":"projects mapped in Chile","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Projects map — Chile","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C19","type":"trade","status":"planned","width":3,"flow":2,"layers":["maritime","foresight"],"coords":[[82.24,16.93],[72.0,11.0],[52.0,13.5],[43.4,12.6],[38.5,20.5],[32.55,29.97],[32.3,31.26],[18.0,34.5],[10.5,37.6],[-5.6,35.95],[-9.6,39.5],[-5.2,48.4],[8.13,53.57]],"color":"#4FB3C7","dash":false,"facts":[{"value":500,"unit":"ktpa ammonia (90 ktpa H2), long-term binding offtake, 2028","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 144, Table 5.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":500,"unit":"ktpa (up to), AM Green–Uniper","source":"Hydrogen Council — Global Hydrogen Compass 2026","source_id":"hc_compass_2026","source_url":"https://compass.hydrogencouncil.com/","page_or_table":"Regional progress — India","date_retrieved":"2026-10-24","license":"© Hydrogen Council — chiffres cités avec attribution","kind":"historical"}]},{"id":"C20","type":"trade","status":"planned","width":2,"flow":2,"layers":["maritime","foresight"],"coords":[[57.7,19.67],[52.0,13.5],[43.4,12.6],[38.5,20.5],[32.55,29.97],[32.3,31.26],[18.0,34.5],[10.5,37.6],[-5.6,35.95],[-9.6,39.5],[-5.2,48.4],[4.48,51.95]],"color":"#4FB3C7","dash":false,"facts":[{"value":2.5,"unit":"Mtpa HBI, firm offtake agreements (thyssenkrupp 40%, Interfer 10%, Glencore 50%)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 144, Table 5.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":1.25,"unit":"Mtpa HBI to thyssenkrupp Materials Trading and Interfer (Europe)","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 50 (Figure 3.6)","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"}]},{"id":"C21","type":"trade","status":"construction","width":2,"flow":2,"layers":["maritime","committed"],"coords":[[14.5,-22.95],[8.0,-12.0],[-6.0,4.0],[-18.0,16.0],[-17.0,30.0],[-10.5,42.0],[-5.2,48.4],[8.6,54.0],[9.99,53.54]],"color":"#C9A84C","dash":false,"facts":[{"value":200,"unit":"ktpa DRI (up to), offtake agreement HyIron → Benteler, first volumes 2026","source":"Hydrogen Europe — Clean Hydrogen Monitor 2026","source_id":"he_chm_2026","source_url":"https://hydrogeneurope.eu/wp-content/uploads/2026/10/Clean_Hydrogen_Monitor_09-2026_withoutAnnex.pdf","page_or_table":"p. 50 (Figure 3.6)","date_retrieved":"2026-10-24","license":"© Hydrogen Europe — chiffres cités avec attribution, aucun graphique reproduit","kind":"historical"},{"value":2.0,"unit":"kt H2/yr — Oshivela DRI project phase 1, operational 2025","source":"IEA — Hydrogen Tracker (Hydrogen Production and Infrastructure Projects Database, June 2026)","source_id":"iea_tracker","source_url":"https://www.iea.org/data-and-statistics/data-tools/hydrogen-tracker","page_or_table":"Project ref. 2592","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"C22","type":"trade","status":"construction","width":3,"flow":2,"layers":["maritime","committed"],"coords":[[-90.98,30.1],[-89.2,28.9],[-86.0,24.5],[-80.0,15.0],[-79.9,9.1],[-85.0,5.0],[-120.0,15.0],[-160.0,25.0],[170.0,30.0],[139.75,35.53]],"color":"#C9A84C","dash":false,"facts":[{"value":500,"unit":"ktpa ammonia (90 ktpa H2) to JERA, 2030","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 144, Table 5.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":280,"unit":"ktpa ammonia (50 ktpa H2) to Mitsui, 2030","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 144, Table 5.1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":772,"unit":"kt ammonia supported by Japan’s CfD scheme","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 209","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]},{"id":"NA-HUB","type":"cluster","status":"target","width":2,"flow":2,"layers":["northafrica","foresight"],"coords":[[-7.6,33.57],[-0.3,35.85],[10.18,36.8],[31.24,30.04]],"color":"#D26A6A","dash":true,"facts":[{"value":4,"unit":"national hydrogen strategies: Morocco (2021), Algeria (2023), Tunisia (2024), Egypt (2024)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 217","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"},{"value":16,"unit":"% weighted average cost of capital in Tunisia (nearly), vs 2.3% in Germany (2024)","source":"IEA — Global Hydrogen Review 2026","source_id":"iea_ghr_2026","source_url":"https://iea.blob.core.windows.net/assets/af4b6218-0311-4963-91ab-903cb18ca0ca/GlobalHydrogenReview2026.pdf","page_or_table":"p. 222","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical"}]}],"centroids":{"AE":[54.3,23.91],"AR":[-64.75,-34.54],"AT":[14.11,47.59],"AU":[134.21,-25.64],"BE":[4.64,50.65],"BG":[25.2,42.77],"BR":[-53.23,-10.68],"CA":[-98.98,58.61],"CH":[8.24,46.81],"CL":[-70.97,-34.53],"CN":[103.35,36.75],"CO":[-73.07,3.91],"CR":[-84.22,10],"CY":[33.23,35.04],"CZ":[15.3,49.71],"DE":[10.36,51.04],"DJ":[42.56,11.74],"DK":[9.27,56.22],"DO":[-70.49,18.9],"DZ":[2.63,28.06],"EE":[25.84,58.68],"EG":[29.88,26.46],"ES":[-3.59,40.36],"FI":[26.21,64.28],"FR":[2.47,46.56],"GB":[-2.39,53.84],"GR":[22.5,39.49],"HR":[16.46,45.17],"HU":[19.38,47.17],"ID":[114.03,-0.19],"IE":[-8.12,53.22],"IN":[79.55,22.8],"IS":[-18.53,65.03],"IT":[12.32,43.48],"JO":[36.75,31.23],"JP":[137.87,36.57],"KE":[37.79,0.6],"KR":[127.88,36.48],"KZ":[67.24,48.36],"LB":[35.88,33.91],"LT":[23.88,55.32],"LV":[24.89,56.86],"MA":[-6.42,31.88],"MR":[-10.38,20.22],"MX":[-102.17,23.92],"MY":[114.69,3.58],"NA":[17.2,-22.08],"NL":[5.66,52.24],"NO":[12.2,63.87],"NZ":[170.62,-43.93],"OM":[56.05,20.56],"PA":[-80.1,8.53],"PE":[-74.43,-9.11],"PL":[19.39,52.12],"PT":[-7.99,39.66],"PY":[-58.44,-23.21],"QA":[51.17,25.35],"RO":[24.98,45.84],"RS":[20.76,44.2],"RU":[95.53,65.91],"SA":[44.66,24.09],"SE":[16.26,62.46],"SG":[103.81,1.35],"SI":[14.77,46.08],"SK":[19.47,48.72],"TN":[9.55,34.1],"TW":[120.96,23.81],"UA":[31.44,49.03],"UG":[32.36,1.27],"US":[-98.82,39.89],"UY":[-56.02,-32.79],"UZ":[63.29,41.78],"VN":[106.35,16.53],"ZA":[25.19,-28.98]},"centroids_note":"Display positions only: centroid of the largest polygon of each country (amCharts worldLow geodata)."}