{"dataset":"gem-2025-derivative-terminals","title":"Hydrogen-derivative import projects at European LNG terminals (Global Energy Monitor, January 2025)","description":"The twelve projects of Table 1: fuel (LH2, NH3, eLNG), capacity and start year where disclosed.","publisher":"H2GHUB","updated":"2026-10-24","license":"CC BY 4.0","attribution":"Global Energy Monitor, Europe Gas Tracker, January 2025 (hydrogen edition), CC BY 4.0","sources":[{"id":"gem_egt_2025","name":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","publisher":"Global Energy Monitor","url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","license":"CC BY 4.0","attribution":"Global Energy Monitor, Europe Gas Tracker, January 2025 (hydrogen edition), CC BY 4.0","date_retrieved":"2026-10-24"}],"schema":"Each entry carries value, unit, source, source_url, page_or_table and date_retrieved. Breakdowns inside an entry (by_status, by_technology, dimensions…) share its provenance. kind = historical | target | projection; projections name their scenario.","entries":[{"value":null,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"zeebrugge","name":"Zeebrugge LNG Terminal","iso2":"BE","country":"Belgium","lng_terminal_status":"operating","fuel":"LH2, NH3","start_year":null,"stage":"actively in development","coords":[3.2,51.33],"position_note":"Map position = terminal location (approximate, for display)."},{"value":null,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"dunkirk","name":"Dunkirk LNG Terminal","iso2":"FR","country":"France","lng_terminal_status":"operating","fuel":"NH3","start_year":null,"stage":"actively in development","coords":[2.27,51.03],"position_note":"Map position = terminal location (approximate, for display)."},{"value":0.2,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"fos-tonkin","name":"Fos Tonkin LNG Terminal","iso2":"FR","country":"France","lng_terminal_status":"operating","fuel":"NH3","start_year":2029,"stage":"actively in development","coords":[4.87,43.42],"position_note":"Map position = terminal location (approximate, for display)."},{"value":2.3,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","note":"Brunsbüttel FSRU: first 0.3 Mtpa stage planned for 2026; second 2 Mtpa stage without a start year.","id":"brunsbuttel-fsru","name":"Brunsbüttel FSRU","iso2":"DE","country":"Germany","lng_terminal_status":"operating","fuel":"NH3","start_year":2026,"stage":"actively in development","coords":[9.15,53.89],"position_note":"Map position = terminal location (approximate, for display)."},{"value":null,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"lubmin-fsru","name":"Lubmin FSRU","iso2":"DE","country":"Germany","lng_terminal_status":"retired","fuel":"NH3","start_year":2026,"stage":"actively in development","coords":[13.64,54.14],"position_note":"Map position = terminal location (approximate, for display)."},{"value":2.6,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"wilhelmshaven-fsru","name":"Wilhelmshaven FSRU","iso2":"DE","country":"Germany","lng_terminal_status":"operating","fuel":"NH3","start_year":2030,"stage":"actively in development","coords":[8.15,53.57],"position_note":"Map position = terminal location (approximate, for display)."},{"value":null,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"wilhelmshaven-tes","name":"Wilhelmshaven TES LNG Terminal","iso2":"DE","country":"Germany","lng_terminal_status":"proposed","fuel":"eLNG","start_year":2025,"stage":"actively in development","coords":[8.12,53.55],"position_note":"Map position = terminal location (approximate, for display)."},{"value":null,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"eemshaven-fsru","name":"Eemshaven FSRU","iso2":"NL","country":"Netherlands","lng_terminal_status":"operating","fuel":"LH2","start_year":null,"stage":"actively in development","coords":[6.83,53.45],"position_note":"Map position = terminal location (approximate, for display)."},{"value":null,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"brunsbuttel-lng","name":"Brunsbüttel LNG Terminal","iso2":"DE","country":"Germany","lng_terminal_status":"construction","fuel":"LH2","start_year":null,"stage":"retrofit proposed for the future","coords":[9.18,53.9],"position_note":"Map position = terminal location (approximate, for display)."},{"value":null,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"stade-lng","name":"Stade LNG Terminal","iso2":"DE","country":"Germany","lng_terminal_status":"construction","fuel":"NH3, LH2","start_year":null,"stage":"retrofit proposed for the future","coords":[9.48,53.63],"position_note":"Map position = terminal location (approximate, for display)."},{"value":null,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"dioriga-fsru","name":"Dioriga FSRU","iso2":"GR","country":"Greece","lng_terminal_status":"proposed","fuel":"LH2","start_year":null,"stage":"retrofit proposed for the future","coords":[23.07,37.93],"position_note":"Map position = terminal location (approximate, for display)."},{"value":null,"unit":"Mtpa (fuel import capacity; null = not disclosed)","source":"Global Energy Monitor — Europe Gas Tracker 2025: Hydrogen edition (briefing)","source_id":"gem_egt_2025","source_url":"https://globalenergymonitor.org/research/europe-gas-tracker-2025-hydrogen-edition","page_or_table":"p. 7, Table 1","date_retrieved":"2026-10-24","license":"CC BY 4.0","kind":"historical","id":"zeeland-fsru","name":"Zeeland Energy FSRU","iso2":"NL","country":"Netherlands","lng_terminal_status":"proposed","fuel":"LH2","start_year":null,"stage":"retrofit proposed for the future","coords":[3.7,51.45],"position_note":"Map position = terminal location (approximate, for display)."}]}